KOU
Teknik Eğitim Fakültesi
 

Scientific Studies and Projects

Project Title : DECOUPLED DUAL WINDING ELECTRIC MACHINE DESIGN AND CONTROL FOR HYBRID ELECTRIC VEHICLE APPLICATIONS
Project No: 110E111
Supporting Foundation(s): Tubitak

Starting Date: 2010
Project Duration: 30 Month
Number of Staff: 6
Current Situation : Ongoing


Project Title : Web Based Mobile Robot Design and Applications
Project No: 2010 / 11
Supporting Foundation(s): Kocaeli Üniversitesi Bilimsel Araştırma Birimi
Starting Date: 2010
Project Duration: 24 Month
Number of Staff: 4
Current Situation : Ongoing


Project Title : Production of biogas from agro-waste and animal waste integrating energy system
Project No: 106G112
Supporting Foundation(s): Tubitak
Starting Date: 2008
Project Duration:36 Month
Number of Staff: 31
Current Situation : Ongoing


Project Title : Formation of National Photovoltaic Technology Platform
Project No: 108M150
Supporting Foundation(s): TUBITAK
Starting Date: 01.09.2009
Project Duration: 36 Month
Number of Staff: 190
Current Situation : Ongoing


Project Title : Design of Active Power Filter
Project No:
Supporting Foundation(s): ENTES Electronics Company
Starting Date: 01.01.2009
Project Duration: 36 Month
Number of Staff: 7
Current Situation : Ongoing


Project Title : Design and development of Modular and Scaleable 3-phase High Frequency Isolated Charge Controller
Project No:
Supporting Foundation(s): GEMES Electronics and KOSGEB
Starting Date: 01.01.2011
Project Duration: 12 Month
Number of Staff: 7
Current Situation : Ongoing


Project Title : Design and implementation of multilevel inverter based 3-phase grid connected active power filter capability photovoltaic electrical energy production system
Project No: 2010/077
Supporting Foundation(s): Kocaeli University Scientific Research Unit
Starting Date: 01.06.2010
Project Duration: 24 Month
Number of Staff: 4
Current Situation : Ongoing


Project Title : Research on a photovoltaic and wind energy based hybrid electric car battery charge potentional in Kocaeli Region
Project No: 2010/044
Supporting Foundation(s): Kocaeli University Scientific Research Unit
Starting Date: 01.06.2010
Project Duration: 18 Month
Number of Staff: 3
Current Situation : Ongoing


Project Title : The control of Radial and Axial Type Permanent Magnet Synchronous Motors and Implementation of Performance Analysis
Project No: 2010/015
Supporting Foundation(s): Kocaeli Üniversitesi Bilimsel Araştırma Birimi
Starting Date: 17th March 2010
Project Duration: 24 Month
Number of Staff: 4
Current Situation : Ongoing


Project Title: Design and Fabrication of Electronically Switched Multifunctional Antenna
Panel (ESMAP)
Project No: 107E198
Supporting Foundation(s): TUBITAK
Starting Date: 2008
Project Duration: 24 Month
Number of Staff: 3
Current Situation : Ongoing


Project Title: Analysis and Design of Metamaterial Based Microstrip Antenna Arrays
Project No: 2010-35
Supporting Foundation(s): The Scientific Research Projects Unit of Kocaeli University
Starting Date: 2010
Project Duration: 24 Month
Number of Staff: 2
Current Situation : Ongoing


Project Title : Hybrid Karting Vehicle
Project No: 2010/84
Supporting Foundation(s): The Scientific Research Projects Unit of Kocaeli University, industrial organizations
Starting Date: June 2010
Project Duration: 8 Month
Number of Staff: 8
Current Situation : Ongoing


Project Title : Three Axis CNC Machine Design and Manufacturing
Project No: 2010/84
Supporting Foundation(s): Kocaeli Üniversitesi Bilimsel Araştırma Birimi , industrial organizations
Starting Date: October 2010
Project Duration: 12 Month
Number of Staff: 6
Current Situation : Ongoing


Project Title : Experimental Design and Manufacturing of Wind Tunnel
Project No: 2010/84
Supporting Foundation(s): Kocaeli Üniversitesi Bilimsel Araştırma Birimi
Starting Date: March 2011
Project Duration: 14 Month
Number of Staff: 4
Current Situation : Ongoing


Project Title : Vibration-Noise Analysis of diesel engines running with alternative fuels and engine fault diagnosis
Project No: 2009/45
Supporting Foundation(s): Scientific Research Unit of Kocaeli University Starting Date: November 2009
Project Duration: 24 Month
Number of Staff: 5
Current Situation : Ongoing


Project Title : The effect of using Etanol-Metanol / Metanol-gasoline mixture in engine performance and exhoust emistion
Project No: 2006/26
Supporting Foundation(s): Kocaeli Üniversitesi Bilimsel Araştırma Birimi
Starting Date: 2006
Project Duration: 26 Month
Number of Staff: 5
Current Situation : Completed


Project Title : Optiv Tomohraph
Project No: Grad. 358
Supporting Foundation(s): Deutschen Forschungsgemeinscharf (DFG)
Starting Date: 2002
Project Duration: 16 Month
Number of Staff: 3
Current Situation : Completed
Project Title : Design and development of Modular and Scaleable Digital Controlled Solar Electric Power Converter
Project No: 3090548
Supporting Foundation(s): TÜBİTAK-TEYDEP
Starting Date: 15.01.2010
Project Duration: 12 Month
Number of Staff: 4
Current Situation : Completed

Project Title: Design, Control and Application of Combined Series-Parallel Active Filter System for Power Quality Correction in 3-Phase 4-Wire Systems
Project No: 108E083
Supporting Foundation(s): TUBITAK
Starting Date: 01.10.2008
Project Duration: 24 Month
Number of Staff: 4
Current Situation: Completed


Project Title: DSP based Active Power Filter Control and Model based embedded code generation with Matlab
Project No: EEEAG 105E182(HD-8)
Supporting Foundation(s): TUBITAK
Starting Date: 01.04.2006
Project Duration: 12 Month
Number of Staff: 5
Current Situation: Completed


Project Title : Smart Solar Power Converter Unit (SSPCU)
Project No: 3090548
Supporting Foundation(s): TÜBİTAK-TEYDEP
Starting Date: 15.01.2010
Project Duration: 8 Month
Number of Staff: 5
Current Situation : Completed


Project Title: Vocational Education of new graduates in Power Electronics and Industrial Automation
Project No: TR/06/A/F/PL3-090
Supporting Foundation(s): National Agency
Starting Date: 01.05.2006
Project Duration: 12 Month
Number of Staff: 12
Current Situation: Completed


Project Title : Experimental Performance Analysis of an R134a Automobile Heat Pump System Driven by a Diesel Engine for Various Heat Sources
Project No: 108M132
Supporting Foundation(s): TÜBİTAK
Starting Date: 01.06.2008
Project Duration: 30 Months
Number of Staff: 7
Budget: 136000 TL
Project Crew in our Faculty: Assoc. Prof. Dr. Murat Hoşöz, Prof. Dr. Mustafa Çanakcı, Doctorate Student Mehmet Direk, Res. Asist. Ali Türkcan, Res. Asist. Ertan Alptekin
Current Situation : Completed


Project Title: Theoretical and Experimental Analysis of the Effects of Refrigerants and Compressor Speed on the Performance of Automobile Air Conditioners
Project No: 2002/37
Supporting Foundation(s): Kocaeli University Unit of Scientific Investigations and Projects
Starting Date: 2002
Project Duration: 24 Months
Number of Staff: 2
Budget: 5600 TL
Project Crew in our Faculty: Assoc. Prof. Dr. Murat Hoşöz, Asist. Prof. Dr. Dilek Özlem Esen
Current Situation : Completed


Project Title : Analysis of Suspension Dynamics Effects on ABS Brake System Performance on Rough Road Project No: 107M188
Supporting Foundation(s): The Scientific and Technological Research Council of Turkey (TÜBİTAK) Starting Date: July 2007
Project Duration: 12 Month
Number of Staff: 4
Current Situation : Completed


Project Title : Analysis of Suspension Dynamics Effects on ABS Brake System Performance on Rough Road Project No: 2007/31
Supporting Foundation(s): Scientific Research Unit of Kocaeli University Starting Date: July 2007
Project Duration: 12 Month
Number of Staff: 3
Current Situation : Completed
Project Title : SOLUTION AND REALIZATION OF PATH PLANNING PROBLEM FOR AUTONOMOUS VEHICLES WITH GENETIC ALGORITHMS AND FPGA
Project No: 2010/097
Supporting Foundation(s): Kocaeli Üniversitesi Bilimsel Araştırma Birimi
Starting Date: 08.12.2010
Project Duration: 24 Month
Number of Staff: 2
Current Situation : Ongoing


Project Title: Potential of the Waste Frying Oils in Restaurants and Fast Foods Found at Izmit and Its Conversion Biodiesel Fuel
Project No: 2003/79
Supporting Foundation(s): Kocaeli University Research Foundation
Starting Date: 2003
Project Duration: 24 Months
Number of Staff: 3
Current Situation: Completed


Project Title: The Effect of Using Different Alcohols in Biodiesel Production on the Cold Flow Properties of Biodiesel Fuel
Project No: 2004/24
Supporting Foundation(s): Kocaeli University Research Foundation
Starting Date: 2004
Project Duration: 24 Months
Number of Staff: 3
Current Situation: Completed


Project Title: Investigation of Performance and Exhaust Emissions of a Spark Ignition Engine Fueled With Etanol-Gasoline/Metanol-Gasoline
Project No: 2006/25
Supporting Foundation(s): Kocaeli University Research Foundation
Starting Date: 2006
Project Duration: 30 Months
Number of Staff: 5
Current Situation: Completed


Project Title: The Effect of the Combustion Characteristics of Biodiesel on NOX Formation
Project No: 104M372
Supporting Foundation(s): TUBITAK 1001
Starting Date: 2004
Project Duration: 24 Months
Number of Staff: 4
Current Situation: Completed


Project Title : Online RFID Data Acquisition System
Project No: 7081049
Supporting Foundation(s): TUBITAK
Starting Date: 2009
Project Duration: 6 Month
Number of Staff:
Current Situation : Completed


Project Title : Numerical Analysis and Design of Left-Handed Metamaterials
Project No: 2005/15
Supporting Foundation(s): The Scientific Research Projects Unit of Kocaeli University
Starting Date: 2005
Project Duration: 24 Month
Number of Staff: 4
Current Situation : Completed

Faculty of Technical Education - Kocaeli University
41380, Umuttepe/KOCAELİ TÜRKİYE
Phone: +90 (262) 303 22 02 / Fax: +90 (262) 303 22 03